TrueTicker

NIFTY 500 › Services

Services · NIFTY 500

JSW Infrastructure Ltd.

JSWINFRA on NSE · 19 Nov 2026

NIFTY 500

337.15 ▼ -0.47 % on the day

Overview Technical Risk & rank Results Accounts Filings Guidance & governance

Filings

73 filings of JSWINFRA since December 2024; the newest 40 below.

credit rating 21, presentation 19, board outcome 14, transcript 8, acquisition 7, results 2

FiledTypeSubject
13 Nov 2026presentation
Capex, Guidance
JSW Infrastructure Limited has informed the Exchange about Investor Presentation
AI summary

JSW Infrastructure filed an investor presentation dated November 2026 under Regulation 30 of the Listing Regulations, also posted on its website.

The presentation covers an overview of the company, growth strategy and guidance, H1 FY27 performance, sustainability, financials, sector outlook and key project updates.

It states 186 MTPA of port capacity, growing to 400 MTPA by 2030, and a market cap of about US$8.5 Bn as of Nov 12, 2026.

It states a logistics network of 8 terminals (ICD/CFS/GCT) with 78 rakes, and a target of 110 rakes by Mar-27.

Written by an AI model (claude-haiku-5-5) from the filing's first pages; it can be wrong - the filing is the source.

NSE copy
30 Oct 2026transcript
Capex, Guidance, Results
JSW Infrastructure Limited has informed the Exchange about Transcript
AI summary

JSW Infrastructure filed the transcript of its Q2 FY27 earnings call held on 27 October 2026, hosted on its website.

Consolidated operating revenue for Q2 FY27 was INR1,481 crores (up 17% YoY) and operating EBITDA was INR674 crores (up 11% YoY); PAT was INR328 crores versus INR369 crores a year earlier.

Management said cargo volumes were 29.4 million tonnes in Q2 FY27, and that the logistics EBITDA margin guidance for FY27 was revised to 28% from 24%, with the overall logistics EBITDA target of INR400 crores retained.

Management said cumulative capex up to September 2026 was about INR8,250 crores, with a further INR6,000 crores committed, and expected FY27 capex of INR5,000-6,000 crores.

Management said the rail rake fleet stands at 78 with a target of at least 110 by March 2027, and that Fujairah tanks are expected to start operations in the first week of November, subject to demand.

Written by an AI model (claude-haiku-5-5) from the filing's first pages; it can be wrong - the filing is the source.

NSE copy
27 Oct 2026presentation
Capex, Guidance, Results
JSW Infrastructure Limited has informed the Exchange about Investor Presentation
AI summary

JSW Infrastructure filed the results presentation for the unaudited standalone and consolidated financial results for the quarter and half year ended 30 September 2026 (Q2 and H1 FY2027), dated 27 October 2026.

The presentation is hosted on the company website and was filed under Regulation 30 of the SEBI Listing Obligations and Disclosure Requirements Regulations, 2015.

The pages provided cover the company overview, strategically located assets with total operational capacity of 186 mtpa, and the logistics platform (ICD, CFS and GCT network of 8 terminals and 78 rakes).

The logistics update states a target of 110 rakes by March 2027.

The financial figures and the management commentary on the Q2 and H1 results are not included in the pages provided.

Written by an AI model (claude-haiku-5-5) from the filing's first pages; it can be wrong - the filing is the source.

NSE copy
27 Oct 2026board outcome
Results
JSW Infrastructure Limited has submitted to the Exchange, the financial results for the period ended September 30, 2026.
AI summary

JSW Infrastructure Limited filed its outcome of the board meeting held on 27 October 2026, enclosing unaudited standalone and consolidated financial results for the quarter and half year ended 30 September 2026, with the Limited Review Report of the Statutory Auditors.

The Audit Committee reviewed and recommended the results, and the Board approved them; the meeting ran from 2:00 p.m. to 4:15 p.m. (IST).

The auditors, Shah Gupta & Co., issued a review report on the consolidated results with no modification; it notes that five subsidiaries' results (total revenue Rs. 834.58 crores for the half year) were reviewed by other auditors and nineteen subsidiaries' results were unreviewed.

The filing does not state the revenue, profit or dividend figures for the parent company itself, as the financial statements themselves are not included in the pages provided.

Written by an AI model (claude-haiku-5-5) from the filing's first pages; it can be wrong - the filing is the source.

NSE copy
05 Oct 2026credit rating
Rating
JSW Infrastructure Limited has informed the Exchange about Credit Rating- Others
AI summary

JSW Infrastructure Limited filed an intimation under Regulation 30 of the SEBI LODR Regulations on 5 October 2026 regarding a credit rating action by Care Ratings Limited.

Issuer rating reaffirmed at CARE AA+; Stable.

Long term / short term bank facilities of Rs 660.00 crore (enhanced from Rs 480.00 crore) reaffirmed at CARE AA+; Stable / CARE A1+.

Short term bank facilities of Rs 10.00 crore reaffirmed at CARE A1+; short term bank facilities of Rs 40.00 crore (enhanced from Rs 20.00 crore) reaffirmed at CARE A1+.

Written by an AI model (claude-haiku-5-5) from the filing's first pages; it can be wrong - the filing is the source.

NSE copy
23 Sep 2026credit rating
Rating
JSW Infrastructure Limited has informed the Exchange about Credit Rating assigned to one of the subsidiary company- JSW Jatadhar Marine Services Private Limited.
AI summary

JSW Infrastructure Ltd filed under Regulation 30 of the SEBI LODR Regulations to disclose a credit rating action on a subsidiary.

Care Ratings Limited, in its press release dated 22 September 2026, assigned a rating to JSW Jatadhar Marine Services Private Limited.

The facility rated is Long Term Bank Facilities of ₹2,100.00 crore, rated CARE AA-; Stable (assigned).

The intimation was received via email on 22 September 2026 at around 8:00 p.m.

Written by an AI model (claude-haiku-5-5) from the filing's first pages; it can be wrong - the filing is the source.

NSE copy
23 Sep 2026credit rating
Rating
JSW Infrastructure Limited has informed the Exchange about revision in Credit Rating of one of the subsidiary company- JSW Dharamtar Port Private Limited.
AI summary

JSW Infrastructure Limited filed an intimation under Regulation 30 of the SEBI LODR Regulations about a credit rating revision of its subsidiary JSW Dharamtar Port Private Limited.

Care Ratings Limited, in its press release dated 22nd September, 2026, upgraded the long-term bank facilities of Rs. 15.00 crore from CARE AA; Stable to CARE AA+; Stable and re-affirmed the short-term rating at CARE A1+.

Care Ratings assigned CARE AA+; Stable to long-term bank facilities of Rs. 400.00 crore and re-affirmed CARE A1+ for short-term bank facilities of Rs. 10.00 crore.

The intimation was received via email on 22nd September, 2026 at around 8:00 p.m.

Written by an AI model (claude-haiku-5-5) from the filing's first pages; it can be wrong - the filing is the source.

NSE copy
23 Sep 2026credit rating
Rating
JSW Infrastructure Limited has informed the Exchange about revision in the Credit Rating of one of the subsidiary company- South West Port Limited.
AI summary

JSW Infrastructure Limited filed under Regulation 30 of SEBI LODR to disclose a credit rating revision of its subsidiary South West Port Limited.

Care Ratings Limited, in its press release dated 22 September 2026, upgraded the long term/short term bank facilities of ₹40.00 crore to CARE AA; Stable / CARE A1+ from CARE AA-; Stable.

Short term bank facilities of ₹1.00 crore were reaffirmed at CARE A1+.

The intimation was received via email on 22 September 2026 at around 8:00 p.m.

Written by an AI model (claude-haiku-5-5) from the filing's first pages; it can be wrong - the filing is the source.

NSE copy
23 Sep 2026credit rating
Rating
JSW Infrastructure Limited has informed the Exchange about revision in the credit rating of one of the subsidiaries- JSW Jaigarh Port Limited.
AI summary

JSW Infrastructure Ltd filed under Regulation 30 of SEBI LODR to disclose a credit rating revision of its subsidiary JSW Jaigarh Port Limited by CARE Ratings.

CARE upgraded the long-term rating on bank facilities of Rs 135.00 crore (long-term/short-term) to CARE AA+; Stable from CARE AA; Stable, and re-affirmed the short-term rating at CARE A1+.

CARE upgraded the long-term bank facilities of Rs 600.00 crore to CARE AA+; Stable from CARE AA; Stable, and re-affirmed the short-term bank facilities of Rs 10.00 crore at CARE A1+.

The press release is dated 22 September 2026; the company received the intimation via email at around 8:00 p.m. on 22 September 2026.

Written by an AI model (claude-haiku-5-5) from the filing's first pages; it can be wrong - the filing is the source.

NSE copy
23 Sep 2026credit rating
Rating
JSW Infrastructure Limited has informed the Exchange about Credit Rating
AI summary

JSW Infrastructure Ltd filed an intimation under Regulation 30 of the SEBI LODR Regulations about a credit rating action by CARE Ratings Ltd, dated 22 September 2026.

CARE Ratings reaffirmed the issuer rating at CARE AA+; Stable.

Long-term/short-term bank facilities of ₹480.00 crore (enhanced from ₹280.00 crore) were reaffirmed at CARE AA+; Stable / CARE A1+.

Short-term bank facilities of ₹20.00 crore were reaffirmed at CARE A1+.

The intimation was received by the company via email on 22 September 2026 at around 8:00 p.m.

Written by an AI model (claude-haiku-5-5) from the filing's first pages; it can be wrong - the filing is the source.

NSE copy
10 Sep 2026acquisition
Acquisition
JSWINFRA: JSW Infrastructure Limited has informed the Exchange about Acquisition of NCR Rail Infrastructure Limited on implementation of the Resolution Plan under the Insolvency and Bankruptcy Code, 2016.
AI summary

JSW Infrastructure announced that its step-down wholly owned subsidiary, Khurja Rail Terminal Private Limited, implemented the Approved Resolution Plan and acquired 100% of NCR Rail Infrastructure Limited effective 10th September, 2026, under the IBC process (NCLT Mumbai order dated 22nd January, 2026).

Cost of acquisition of NCR Rail is Rs. 467.47 Crore in cash, plus Rs. 41.94 Crore paid for purchase of about 39.57 acres of land from Arshiya Limited.

NCR Rail owns and operates a private freight terminal in Khurja, Uttar Pradesh; FY 2026 revenue from operations was Rs. 11.19 Crore and PAT was Rs. (25.96) Crore.

AMD Business Support Services Private Limited, a wholly owned subsidiary of NCR Rail and non-operational, also became a step-down wholly owned subsidiary of the Company from 10th September, 2026, at a cost of Rs. 1,00,000.

Written by an AI model (claude-haiku-5-5) from the filing's first pages; it can be wrong - the filing is the source.

NSE copy
22 Aug 2026acquisition
Acquisition
JSW Infrastructure Limited has informed the Exchange about Update on Acquisition
AI summary

JSW Infrastructure Ltd filed an update on its acquisition of 100% of the share capital of JSW Overseas FZE, referring to its earlier intimation dated 16 January 2026.

The company executed a Share Purchase Agreement on 22 August 2026 at around 7:00 p.m. (IST) with JSW Terminal (Middle East) FZE, the seller, and JSW Overseas FZE.

The acquisition is subject to receipt of necessary approvals of the relevant authorities under applicable laws of India and UAE.

On completion, JSW Overseas FZE, currently a step-down wholly owned subsidiary, will become a direct wholly owned subsidiary of the company.

Written by an AI model (claude-haiku-5-5) from the filing's first pages; it can be wrong - the filing is the source.

NSE copy
21 Aug 2026credit rating
Rating
JSW Infrastructure Limited has informed the Exchange about Credit Rating
AI summary

JSW Infrastructure Ltd filed an intimation under Regulation 30 of the SEBI LODR Regulations, dated 21 August 2026, on a Fitch Ratings release.

Fitch Ratings, in its press release dated 19 August 2026, affirmed the company's Long-Term Foreign-Currency Issuer Default Rating (IDR) at 'BBB-' with Stable Outlook.

Fitch also affirmed the rating on the company's USD 400 million senior secured notes due 2029 at 'BBB-' with Stable Outlook.

The intimation was received by the company via email on 20 August 2026 at around 2:01 p.m.

Written by an AI model (claude-haiku-5-5) from the filing's first pages; it can be wrong - the filing is the source.

NSE copy
05 Aug 2026presentation
Capex, Guidance
JSW Infrastructure Limited has informed the Exchange about Investor Presentation
AI summary

JSW Infrastructure filed an investor presentation dated August 2026 under Regulation 30 of the SEBI Listing Regulations, also posted on the company website.

The presentation covers the group overview, growth strategy and guidance, Q1 FY27 operational and financial performance, and project updates.

Company profile in the deck: 186 MTPA port capacity, growing to 400 MTPA by 2030, with a market cap of about US$8 Bn as of July 30, 2026.

Port and terminal footprint: operational capacity of 186 MTPA, with the company holding a majority stake in PNP Port, plus O&M contracts at dry bulk terminals in Fujairah (24 mtpa) and Dibba (17 mtpa) in UAE.

Logistics land bank of 3,221 acres, with 369 acres in total across Panvel, Morbi and Kudathini locations.

Written by an AI model (claude-haiku-5-5) from the filing's first pages; it can be wrong - the filing is the source.

NSE copy
27 Jul 2026transcriptJSW Infrastructure Limited has informed the Exchange about Transcript
AI summary

JSW Infrastructure Limited filed a letter on 27 July 2026 under Regulation 30 of the Listing Regulations, giving a link to the transcript of its Q1 FY27 earnings conference call held on 21 July 2026.

The transcript is hosted on the company website at jswinfrastructure.in/investors/quarterly-results/.

The filing itself contains no financial figures, outlook or management commentary; the transcript content is not included in these pages.

Written by an AI model (claude-haiku-5-5) from the filing's first pages; it can be wrong - the filing is the source.

NSE copy
21 Jul 2026presentation
Results
JSW Infrastructure Limited has informed the Exchange about Investor Presentation
AI summary

JSW Infrastructure filed its results presentation dated 21 July 2026 on the unaudited standalone and consolidated financial results for the quarter ended 30 June 2026 (Q1 FY2027), under Regulation 30 of the SEBI Listing Obligations and Disclosure Requirements.

The pages provided show the company overview: total operational capacity of 186 mtpa, comprising ports with 120 mtpa and terminals with 26.3 mtpa, plus O&M contracts at Fujairah (24 mtpa) and Dibba (17 mtpa) in UAE.

The logistics footprint includes a land bank of 3,221 acres, 602 domestic standard containers, 6 RTG cranes and 422 rakes.

The financial figures for Q1 FY2027 are not included in the pages provided.

Written by an AI model (claude-haiku-5-5) from the filing's first pages; it can be wrong - the filing is the source.

NSE copy
21 Jul 2026board outcome
Results
JSW Infrastructure Limited has submitted to the Exchange, the financial results for the period ended Jun 30, 2026.
AI summary

JSW Infrastructure Limited filed the outcome of its board meeting held on 21 July 2026.

The board approved the unaudited standalone and consolidated financial results for the quarter ended 30 June 2026, along with the Independent Auditor's Limited Review Report.

The results were reviewed and recommended by the Audit Committee before board approval.

The board meeting ran from 2:00 p.m. to 3:45 p.m. (IST).

Written by an AI model (claude-haiku-5-5) from the filing's first pages; it can be wrong - the filing is the source.

NSE copy
10 Jul 2026acquisition
Acquisition
JSW Infrastructure Limited has informed the Exchange about Acquisition- Incorporation of a wholly owned subsidiary company
AI summary

JSW Infrastructure Limited filed to inform exchanges that it incorporated a wholly owned subsidiary, JSW Kolkata Outer Harbour Container Terminal Private Limited, on 10 July 2026.

The company received intimation of the incorporation from the Ministry of Corporate Affairs by email on 10 July 2026 at about 12:40 p.m.

The subsidiary was formed to enter into a concession agreement under a Letter of Award from Syama Prasad Mookerjee Port Authority, Kolkata, for integrated development of Outer Container Terminal and Berth nos. 1 through 5 at Netaji Subhash Dock on a DBFOT PPP basis.

JSW Infrastructure subscribed to 10,000 equity shares of Rs. 10 each for Rs. 1,00,000 in cash and holds 100% of the subsidiary.

Written by an AI model (claude-haiku-5-5) from the filing's first pages; it can be wrong - the filing is the source.

NSE copy
02 Jul 2026credit rating
Rating
JSW Infrastructure Limited has informed the Exchange about Credit Rating
AI summary

Moody's Ratings assigned JSW Infrastructure an issuer rating of Baa3 with Stable outlook, per its press release dated 1 July 2026.

Moody's upgraded the US$ 400 million 4.95% Senior Secured Notes due 2029 to Baa3 from Ba1.

The company said the rating follows its recent Qualified Institutional Placement (QIP), which it said strengthened financial flexibility and liquidity.

The company said it has investment grade ratings from Fitch Ratings, S&P Global Ratings and Moody's over the past one year.

CFO Nagarajan J said the rating reinforces the company's ability to access global capital efficiently.

Written by an AI model (claude-haiku-5-5) from the filing's first pages; it can be wrong - the filing is the source.

NSE copy
19 Jun 2026credit rating
Rating
JSW Infrastructure Limited has informed the Exchange about Credit Rating- New
AI summary

JSW Infrastructure Limited filed a Regulation 30 intimation dated 19 June 2026 on a credit rating from CARE Ratings Limited.

CARE Ratings assigned a rating of "CARE AA; Stable" to long-term bank facilities of Rs. 650.00 crore of Paradip East Quay Coal Terminal Private Limited, a subsidiary of the company.

The intimation was received by the company via email on 18 June 2026 at around 05:15 p.m.

Written by an AI model (claude-haiku-5-5) from the filing's first pages; it can be wrong - the filing is the source.

NSE copy
19 Jun 2026credit rating
Rating
JSW Infrastructure Limited has informed the Exchange about Credit Rating- Revision
AI summary

JSW Infrastructure Ltd filed under Regulation 30 of SEBI LODR to disclose a credit rating from CARE Ratings Limited for JSW Jaigarh Port Limited, its wholly owned subsidiary.

Long term bank facilities of Rs. 600.00 crore (enhanced from Rs. 105 crore) rated CARE AA; Stable (assigned).

Long term / short term bank facilities of Rs. 135.00 crore (enhanced from Rs. 30 crore) rated CARE AA; Stable / CARE A1+ (reaffirmed).

Short term bank facilities of Rs. 10.00 crore rated CARE A1+ (reaffirmed).

The intimation was received by the company via email on 18 June 2026 at around 12:40 p.m.

Written by an AI model (claude-haiku-5-5) from the filing's first pages; it can be wrong - the filing is the source.

NSE copy
12 May 2026transcriptJSW Infrastructure Limited has informed the Exchange about Transcript
AI summary

JSW Infrastructure Ltd filed a link to the transcript of its Q4 FY26 earnings conference call held on 8 May 2026, under Regulation 30 of the Listing Regulations.

The transcript is hosted on the company website at jswinfrastructure.in under the FY 2025-26 financial results page.

The filing text itself contains no financial figures, guidance or management commentary.

Written by an AI model (claude-haiku-5-5) from the filing's first pages; it can be wrong - the filing is the source.

NSE copy
11 May 2026presentation
Guidance
JSW Infrastructure Limited has informed the Exchange about Investor Presentation
AI summary

JSW Infrastructure Ltd filed its Investor Presentation dated May 2026 under Regulation 30 of the Listing Regulations on 11 May 2026.

The presentation covers an overview of the company, growth strategy and guidance, FY26 operational and financial performance, sustainability and CSR, and robust financials and balance sheet.

It states the company has 183 MTPA of operational port capacity, growing to 400 MTPA by 2030, and is India's 2nd largest private ports operator.

It states the company's market cap is about US$6 Bn as of May 08, 2026, and that the JSW Group's steel capacity is 35.7 MTPA, growing to 51.52 MTPA by FY31.

Written by an AI model (claude-haiku-5-5) from the filing's first pages; it can be wrong - the filing is the source.

NSE copy
08 May 2026presentation
Results
JSW Infrastructure Limited has informed the Exchange about Investor Presentation
AI summary

JSW Infrastructure filed its results presentation on 8 May 2026 covering the audited standalone and consolidated financial results for the quarter and year ended 31 March 2026, filed under Regulation 30 of the SEBI LODR Regulations.

The presentation is also hosted on the company website.

The pages provided contain the cover, forward-looking statements disclaimer, and an overview of the company's assets: total operational capacity of 183 mtpa, with O&M contracts at dry bulk terminals in Fujairah (24 mtpa) and Dibba (17 mtpa) in UAE.

The pages provided do not include the financial figures or management commentary on results.

Written by an AI model (claude-haiku-5-5) from the filing's first pages; it can be wrong - the filing is the source.

NSE copy
08 May 2026dividend
Dividend / buy-back, Results
JSW Infrastructure Limited has informed the Exchange that Board of Directors at its meeting held on May 08, 2026, recommended Final Dividend of Rs. 0.90 per equity share.
AI summary

JSW Infrastructure Limited's board, meeting on 8 May 2026, approved the audited standalone and consolidated financial results for the quarter and year ended 31 March 2026, with an unmodified audit opinion.

The board recommended a dividend of Rs. 0.90 per equity share of Rs. 2 each for FY 2025-26, subject to shareholder approval.

The board approved M/s. Kishore Bhatia and Associates as Cost Auditor and Mr. Haresh Dua, Chartered Accountant, as Internal Auditor for FY 2026-27.

The company will announce the AGM date and dividend payment date later.

Written by an AI model (claude-haiku-5-5) from the filing's first pages; it can be wrong - the filing is the source.

NSE copy
08 May 2026board outcome
Dividend / buy-back, Results
JSW Infrastructure Limited has submitted to the Exchange, the financial results for the period ended March 31, 2026.
AI summary

JSW Infrastructure Limited's board, at its meeting on 8 May 2026, approved the audited standalone and consolidated financial results for the quarter and year ended 31 March 2026, with an unmodified audit opinion from Shah Gupta & Co.

The board recommended a dividend of Rs. 0.90 per equity share of Rs. 2 each for FY 2025-26.

The board approved the appointment of Kishore Bhatia and Associates as Cost Auditor and Mr. Haresh Dua, Chartered Accountant, as Internal Auditor, both for FY 2026-27.

The AGM date and dividend payment date will be informed later.

Written by an AI model (claude-haiku-5-5) from the filing's first pages; it can be wrong - the filing is the source.

NSE copy
20 Feb 2026board outcome
Acquisition, Management change
JSW Infrastructure Limited has informed the Exchange regarding Outcome of Board Meeting held on February 20, 2026.
AI summary

JSW Infrastructure's board on 20 February 2026 approved the appointment of Mr. Kartick Maheshwari (DIN 07969734) as an Additional Director designated as Non-Executive Independent Director for three years, from 20 February 2026 to 19 February 2029, subject to member approval.

The appointment follows the second consecutive term of Mr. Amitabh Kumar Sharma as Independent Director ending on 27 March 2026.

The board approved raising funds through issuance of up to 25,00,00,000 equity shares of face value Rs 2/- each via QIP, Further Public Offer, Rights Issue or other permissible mode, subject to member approval and regulatory approvals.

The company said the equity raise will support its multi-year expansion programme and enable compliance with SEBI's Minimum Public Shareholding requirement.

The board authorised the Finance Committee to decide timing, price and terms of the issuance; a postal ballot notice will be filed with exchanges once dispatch begins.

Written by an AI model (claude-haiku-5-5) from the filing's first pages; it can be wrong - the filing is the source.

NSE copy
04 Feb 2026presentation
Acquisition, Capex, Guidance, Results
JSW Infrastructure Limited has informed the Exchange about Investor Presentation
AI summary

JSW Infrastructure filed its February 2026 investor presentation under Regulation 30 of the SEBI Listing Regulations, with copies sent to BSE, NSE and India INX.

The presentation covers the company's overview, growth strategy and guidance, Q3 and 9M FY26 operational and financial performance, sustainability, and key project updates.

It states a total operational port capacity of 177 mtpa across 3 ports and 10 terminals, with 13.3 GW installed power generation capacity.

It states the acquisition of 61.2% of Akzo Nobel (paints) was completed in December 2025.

The pages provided include the cover, forward-looking statement and port asset overview; the financial figures and management commentary are not in the pages supplied.

Written by an AI model (claude-haiku-5-5) from the filing's first pages; it can be wrong - the filing is the source.

NSE copy
21 Jan 2026transcriptJSW Infrastructure Limited has informed the Exchange about Transcript
AI summary

JSW Infrastructure Limited filed the transcript of its Q3 FY26 earnings conference call held on 16 January 2026, under Regulation 46(2) of the Listing Regulations.

The transcript is hosted on the company website at the link given in the filing.

The filing itself contains no financial figures, management commentary or outlook; the call content is not in the pages provided.

Written by an AI model (claude-haiku-5-5) from the filing's first pages; it can be wrong - the filing is the source.

NSE copy
16 Jan 2026board outcome
Acquisition, Legal
JSW Infrastructure Limited has informed the Exchange regarding Outcome of Board Meeting held on January 16, 2026.
AI summary

JSW Infrastructure filed the outcome of its board meeting held on 16 January 2026, which followed separate intimation of unaudited standalone and consolidated results for the quarter and nine months ended 31 December 2025.

The board approved acquisition of 100% shares of JSW Overseas FZE from JSW Terminal (Middle East) FZE at book value, for total consideration of INR 19.21 Lakhs (AED 78446/-), cash consideration.

JSW Overseas is a step-down wholly owned subsidiary that has not yet commenced business; post-acquisition it becomes a direct wholly owned subsidiary. Completion is expected within 60 days of receipt of approvals under Indian and UAE law.

The board approved the Shri O.P. Jindal Employee Stock Ownership Plan (JSWIL) - 2026, subject to member approval by postal ballot and other regulatory approvals.

Written by an AI model (claude-haiku-5-5) from the filing's first pages; it can be wrong - the filing is the source.

NSE copy
16 Jan 2026acquisition
Acquisition, Legal
JSW Infrastructure Limited has informed the Exchange about Acquisition
AI summary

Board of JSW Infrastructure approved acquisition of 100% shares of JSW Overseas FZE from JSW Terminal (Middle East) FZE, a step-down wholly owned subsidiary, at book value for total consideration of INR 19.21 Lakhs (AED 78446/-), paid in cash.

Post acquisition, JSW Overseas FZE becomes a direct wholly owned subsidiary of the Company; the transaction is a related party transaction on arm's length basis, aimed at administrative and operational convenience.

Completion is subject to approvals under Indian and UAE laws and is expected within 60 days of receipt of those approvals.

Board also approved the Shri O.P. Jindal Employee Stock Ownership Plan (JSWIL) - 2026, subject to member approval by postal ballot and other regulatory approvals.

Written by an AI model (claude-haiku-5-5) from the filing's first pages; it can be wrong - the filing is the source.

NSE copy
16 Jan 2026presentation
Capex, Guidance, Results
JSW Infrastructure Limited has informed the Exchange about Investor Presentation
AI summary

JSW Infrastructure filed its results presentation on 16 January 2026 covering unaudited standalone and consolidated financial results for the quarter and nine months ended 31 December 2025.

The filing states total operational capacity of 177 mtpa across its ports and terminals, with O&M contracts at dry bulk terminals in Fujairah (24 mtpa) and Dibba (17 mtpa), UAE.

The presentation also covers the company's growth strategy and guidance, operational and financial performance, and logistics assets including a land bank of 3,036 acres.

The pages provided do not include the financial figures, revenue, profit or guidance numbers, and no management commentary on the results.

Written by an AI model (claude-haiku-5-5) from the filing's first pages; it can be wrong - the filing is the source.

NSE copy
16 Jan 2026board outcome
Results
JSW Infrastructure Limited has submitted to the Exchange, the financial results for the period ended December 31, 2025.
AI summary

JSW Infrastructure Limited filed its unaudited standalone and consolidated financial results for the quarter and nine months ended 31 December 2025, approved by the Board on 16 January 2026.

The Board meeting ran from 2:45 p.m. to 5:00 p.m. (IST), and the Audit Committee reviewed the results before Board approval.

Shah Gupta & Co., Chartered Accountants, issued a limited review report on the consolidated results with no modification of its conclusion.

For the consolidated group, the auditor cites subsidiary total revenues of Rs. 400.84 crores for the quarter and Rs. 1,081.23 crores year to date, and total net profit after tax of Rs. 129.67 crores for the quarter and Rs. 330.16 crores year to date (from 4 reviewed subsidiaries).

The filing does not state the group's own consolidated revenue or profit figures in the pages provided.

Written by an AI model (claude-haiku-5-5) from the filing's first pages; it can be wrong - the filing is the source.

NSE copy
08 Dec 2025presentation
Acquisition, Capex, Guidance
JSW Infrastructure Limited has informed the Exchange about Investor Presentation
AI summary

JSW Infrastructure filed an investor presentation under Regulation 30 on 8 December 2025, following its earlier intimation of a share purchase agreement.

The agreement is for JSW Port Logistics Private Limited, a wholly owned subsidiary, to acquire 100% of the equity share capital of JSW Rail Infra Logistics Private Limited, JSW Minerals Rail Logistics Private Limited and JSW (South) Rail Logistics Private Limited.

The presentation covers the acquisition of the railway rakes business and the company's logistics strategy.

Stated FY30 targets in the presentation: revenue ₹8,000 crore, EBITDA ₹2,000 crore, and capex of ₹9,000 crore over FY25-30.

The presentation also cites 1.6 billion tonnes of freight volume achieved in FY25 and a rail freight share of 27%, with a target of 45% by 2030.

Written by an AI model (claude-haiku-5-5) from the filing's first pages; it can be wrong - the filing is the source.

NSE copy
08 Dec 2025acquisition
Acquisition, Legal
JSW Infrastructure Limited has informed the Exchange about Acquisition
AI summary

JSW Port Logistics Pvt Ltd, a wholly owned subsidiary, entered into a Share Purchase Agreement to acquire 100% equity of JSW Rail Infra Logistics, JSW Minerals Rail Logistics and JSW (South) Rail Logistics from JSW Shipping & Logistics, a promoter-group company, subject to conditions precedent.

Cost of acquisition is Rs. 1,212 Crore (enterprise value), subject to working capital adjustment on the closing date, paid in cash.

Target FY2025 revenue from operations: JSW Rail Rs. 96.5 Crore and JSW Minerals Rs. 31.1 Crore; FY2025 PAT: Rs. 10.2 Crore and Rs. 10.9 Crore respectively.

The acquisition requires Ministry of Railways approval and approval of the Company's members; completion is expected within 30 days of fulfilment of conditions precedent.

The transaction is a related party transaction, carried out on an arm's length basis per an independent valuer's report.

Written by an AI model (claude-haiku-5-5) from the filing's first pages; it can be wrong - the filing is the source.

NSE copy
01 Dec 2025presentation
Capex, Guidance
JSW Infrastructure Limited has informed the Exchange about Investor Presentation
AI summary

JSW Infrastructure filed its investor presentation for December 2025 under Regulation 30 of the SEBI Listing Regulations, dated 1 December 2025, with BSE and NSE.

The presentation covers an overview of the company, growth strategy, Q2 and H1 FY26 operational and financial performance, sustainability, financials and balance sheet, and key project updates.

It states the company is the second largest private port operator in India with 177 mtpa total operational capacity across 3 operational ports and 7 operating terminals.

The company's presentation lists a market cap of about US$6 Bn for the infrastructure business, as of 28 November 2025.

The pages provided include only the cover, forward-looking statement, agenda and asset overview; financial figures for Q2 and H1 FY26 are not in the pages provided.

Written by an AI model (claude-haiku-5-5) from the filing's first pages; it can be wrong - the filing is the source.

NSE copy
20 Nov 2025credit rating
Rating
JSW Infrastructure Limited has informed the Exchange about Credit Rating
AI summary

JSW Infrastructure Limited filed an intimation under Regulation 30 of the SEBI LODR Regulations, 2015, on credit rating, dated 20 November 2025.

CARE Ratings Limited, by letter dated 19 November 2025, reaffirmed the Company's bank facilities of ₹280.00 crore (reduced from ₹480.00 crore) at CARE AA+; Stable / CARE A1+.

CARE also reaffirmed a short-term bank facility of ₹20.00 crore at CARE A1+ and the issuer rating at CARE AA+; Stable.

CARE withdrew the rating on the Company's Commercial Paper, which had been repaid on its due date.

Written by an AI model (claude-haiku-5-5) from the filing's first pages; it can be wrong - the filing is the source.

NSE copy
17 Nov 2025acquisition
Acquisition, Capex, Legal
JSW Infrastructure Limited has informed the Exchange about Acquisition
AI summary

JSW Overseas FZE, a step-down wholly owned subsidiary, entered into a Share Subscription and Purchase Agreement with Minerals Development Oman SAOC and South Minerals Port Company SAOC (Port SPV) on 17 November 2025 to acquire 51% of the Port SPV's equity share capital, subject to conditions precedent.

The Port SPV will develop, own, maintain and operate a 27 MTPA port in Oman with total project capex of US$419 million; the port is yet to commence operations and the Port SPV was incorporated on 21-08-2025.

A shareholders' agreement with MDO governing the Port SPV was also executed on the same day; the remaining 49% will be held by MDO.

Consideration is cash; completion is expected within 60 days of fulfilment of all conditions precedent, subject to Omani government approvals.

Per the press release, construction is expected to take 36 months, with commercial operations targeted in the first half of calendar year 2029.

Written by an AI model (claude-haiku-5-5) from the filing's first pages; it can be wrong - the filing is the source.

NSE copy
01 Nov 2025presentationJSW Infrastructure Limited has informed the Exchange about Investor Presentation
AI summary

JSW Infrastructure filed an investor presentation dated November 2025 under Regulation 30 of the Listing Regulations on 1 November 2025, also posted on its website.

The presentation covers the company overview, growth strategy, Q2 and H1 FY26 operational and financial performance, sustainability, financials and balance sheet, and key project updates.

It states the company is the second largest private port operator in India with 177 mtpa total operational capacity across 3 operational ports and 7 operating terminals.

The presentation shows market cap of about US$7 Bn for the company, as of October 27, 2025.

The excerpts reviewed (cover, disclaimer and overview pages) do not include the Q2 and H1 FY26 financial figures.

Written by an AI model (claude-haiku-5-5) from the filing's first pages; it can be wrong - the filing is the source.

NSE copy
23 Oct 2025transcriptJSW Infrastructure Limited has informed the Exchange about Transcript
AI summary

JSW Infrastructure Ltd filed on 23 October 2025 a link to the transcript of its Q2 FY26 earnings conference call held on 16 October 2025, under Regulation 46(2) of the SEBI Listing Regulations, 2015.

The filing is a cover letter with a website link only; the pages provided do not include the transcript text or any financial figures or management commentary.

Written by an AI model (claude-haiku-5-5) from the filing's first pages; it can be wrong - the filing is the source.

NSE copy

The list of announcements the National Stock Exchange publishes for the company; each link opens the exchange's own copy. Ask Sensei searches these filings when a question names the company.

Ask Sensei

Ask Sensei

Ask about any NIFTY 500 company in plain words. The answer comes from its own filings, with the page behind every point.

For example:

See a sample answer

Start free Sign in